Rail Replacement 25th June & 2nd July
Rail Replacement 25th June & 2nd July
Worcester have picked up a Rail Replacement contract between Worcester (both stations) and Malvern (also both stations) on Sunday 25th June and 2nd July 2017. These will be worked using the Volvo single-deck buses. There is also some work for the coach running between Evesham and Hereford.
Re: Rail Replacement 25th June & 2nd July
Took these pictures this morning at Shrub Hill - quite a variety of operators!AdamH wrote: ↑20:59 Wednesday 14th June 2017Worcester have picked up a Rail Replacement contract between Worcester (both stations) and Malvern (also both stations) on Sunday 25th June 2017. These will be worked using the Volvo single-deck buses. There is also some work for the coach running between Evesham and Hereford.
Re: Rail Replacement 25th June & 2nd July
Just got home from working a morning shift on the Rail Replacement. Like Tim said, there was a huge array of operators working the services.
In a correction to my original post, First were not running the Evesham to Hereford and their coach 20202 was used as a stand-by vehicle at Shrub Hill. First also provided two stand-by vehicles at Great Malvern Station, in addition to two service vehicles (All Volvo B7RLE / Plaxton Centro). The coach was needed for a trip to Evesham in the afternoon so one of the Malvern stand-by vehicles was moved to Shrub Hill to take its place.
I spotted Lugg Valley working Rail Replacement in Malvern so I'm guessing that was the Hereford vehicle.
Don't worry if you missed it... The same thing is happening again next week!
In a correction to my original post, First were not running the Evesham to Hereford and their coach 20202 was used as a stand-by vehicle at Shrub Hill. First also provided two stand-by vehicles at Great Malvern Station, in addition to two service vehicles (All Volvo B7RLE / Plaxton Centro). The coach was needed for a trip to Evesham in the afternoon so one of the Malvern stand-by vehicles was moved to Shrub Hill to take its place.
I spotted Lugg Valley working Rail Replacement in Malvern so I'm guessing that was the Hereford vehicle.
Don't worry if you missed it... The same thing is happening again next week!
Re: Rail Replacement 25th June & 2nd July
The duty rota for next weeks rail replacement (2nd July) has been posted and it looks like we have more work that last week. I haven't seen the work content yet but it does show me with a break at Hereford Rail Station, so it looks like at least one of Worcester's vehicles will be going there.
Re: Rail Replacement 25th June & 2nd July
Mind out for those Yeomans drivers
- Posts: 103
- Joined: 15:51 Sunday 3rd July 2016
- Location: Hereford
Re: Rail Replacement 25th June & 2nd July
I'm in Weston Super Mare for the weekend so there's one less to hide from!
Re: Rail Replacement 25th June & 2nd July
Much more busy today than last week. All of the stand-by buses have been out, and my first Hereford had a dupe (Commandry Coaches) as far as Great Malvern. Loads of different operators again with at least 7 parked up in Hereford.
I'm about to run the 2152 to Hereford, calling at all stops, so won't be home until late. I'll post photos tomorrow.
I'm about to run the 2152 to Hereford, calling at all stops, so won't be home until late. I'll post photos tomorrow.
- Posts: 121
- Joined: 20:20 Monday 4th July 2016
- Location: Solihull
Re: Rail Replacement 25th June & 2nd July
Was that Lloyds Coaches of Machynlleth?
That's a long way away from Hereford!
That's a long way away from Hereford!